I have a time table that got created through SSAS but it has only data upto 2012. I need to load the data for 2013. How can I do this without messing up my cube? Otherwords, I don't want to re-deploy the cube or re-process the cube.I am on 2008 R2 and time table was populated using dimension wizard.Thanks for your help.
↧